We're making progress on the basement!
The framing is basically done with the exception of a couple little areas. The plumbers came today and ran the water lines for the bar sink and dishwasher. They moved a pipe that was going to be in the way of the fireplace flu and ran the water lines for the sink in the basement bathroom. Probably the most exciting for me was to see the shower they installed. It's just pretty cool to see things falling into place. I think the next item on the list of things to do is to get the fireplace installed and then the plumber will come back and run a gas line to the fireplace. Then electrical and sheetrock. It will really be exciting once the sheetrock goes up!
I think that's all for today. Mav and Dad are on an after dinner cruise in the '56. I better go run bath water so it's ready when the little man gets home. He's got quite a little routine and we learned last night that if we skip any part of the routine he protests at bed time!